VECTOR INTEGRITY · RBI AND MECHANICAL INTEGRITY WORKSPACE

Integrity decisions with the evidence still attached.

Vector Integrity helps pressure-equipment teams review CML history, remaining-life screens, fleet risk, and inspection priorities with the inputs and calculation basis kept in view.

Private, guided evaluation. Pilot outputs stay under your team's review.

API AND ASME SOURCE BASES SHOWN WHERE IMPLEMENTED

Exact method coverage and engineering-use boundaries are reviewed during the pilot.

ONE PRODUCT · THREE BUYER OUTCOMES

From inspection records to a decision your team can review.

Vector Integrity brings the calculation, its method status, and the unresolved evidence gaps into the same operating view.

Find what deserves attention

Rank and filter pressure-equipment assets by displayed risk, remaining-life pressure, and inspection due state.

See the calculation basis

Review corrosion-rate, T-min, MAWP, and remaining-life screens with their inputs, formulas, and method status.

Expose what is missing

Keep missing citations, source documents, and calculation-basis fields visible as review gaps.

PAID PILOT → SUBSCRIPTION

Prove it on a bounded slice of your program.

Start with a paid, fixed-scope pilot on an agreed equipment set. We map the source data, configure a protected evaluation workspace, run guided review sessions, and document what is ready, blocked, and required for an ongoing subscription deployment.

Engineering decisions remain under authorized customer review; pilot outputs are decision support, not automatic release.

Define the pilot

A bounded pilot can include

  • Agreed equipment and inspection-data sample
  • Import mapping and exception review
  • Configured protected evaluation workspace
  • Guided CML, remaining-life, fleet-risk, and inspection-priority review
  • Calculation and evidence-gap register
  • Closeout with production requirements and a subscription proposal

Price, duration, data limits, security terms, and success criteria are agreed before work begins.

THE REVIEW PATH

From thickness history to a reviewable inspection decision.

  1. 01

    Map a controlled sample

    Bring an agreed equipment register, inspection history, and CML readings into a bounded evaluation workspace.

  2. 02

    Review calculations and data holds

    Inspect calculation inputs, method status, and unresolved source or data gaps.

  3. 03

    Prioritize attention

    Use the fleet view and 5×5 matrix to review which assets require attention first and why.

  4. 04

    Close with a decision

    Document pilot findings, unresolved requirements, and the path into an ongoing subscription deployment.

EVIDENCE MODEL

See the basis before you trust the answer.

Selected calculations and risk outputs keep their inputs, method status, source references, and unresolved evidence gaps visible for review.

01Source recordReadings, dates, equipment basis
02CalculationFormula, inputs, method status
03Review holdMissing basis stays visible
04Decision reviewRelease remains with the customer's authorized reviewer
  • Corrosion-rate screens use dated thickness history and reject invalid or reversed reading sequences.
  • Remaining-life outputs fail closed when required thickness or governing corrosion rate is missing.
  • T-min and MAWP screens expose the formula inputs used in the result.
  • Risk views distinguish code-derived, imported, unsupported, and heuristic or draft method status.
  • Basis-coverage views show where citations, source documents, or calculation fields are still missing.
Try the illustrative screening calculators ↓

FIELD CALCULATORS

Screening math an inspector can review.

Four narrow calculators now run in the browser: readings in, calculation path out, source hold visible before a result is used outside the screen.

Corrosion rate

Wall loss, short/long rate, and remaining life from two dated readings.

Corrosion rate screening inputs
ReadyScreening math · reviewer release required
Wall loss in0.034
Rate mpy8.48
Elapsed years4.01
Remaining life17.8 yr
Wall over retire in+0.151

Calculation path

Loss

0.365 - 0.331 = 0.034 in

Rate

0.034 in / 4.01 yr = 8.48 mpy

Remaining life

(0.331 - 0.18) / rate = 17.8 yr

STARTING USE CASES

Designed for code-governed asset programs

Guided demos currently focus on pressure-equipment workflows. Adjacent industry coverage remains explicitly labeled as roadmap.

GUIDED DEMO

Refining & Petrochemical

RBI, CML tracking, API 510/570 interval review, inspection-priority views, and evidence-gap review.

ROADMAP

Tanks & Terminals

Planned coverage for API 653 inspection planning, shell/course readings, settlement evidence, and staged report workflows.

ROADMAP

Midstream & Pipelines

Planned coverage for segment records, HCA planning, inspection history, consequence review, and integrity-priority ranking.

ROADMAP

Power, Utilities & Manufacturing

Planned extensions for pressure-equipment programs, overdue inspection control, repair deferrals, calibration evidence, and review KPIs.

VECTOR INTEGRITY CAPABILITY MAP

One focused product. A deliberate expansion path.

The catalog records current guided-demo capabilities, work in validation, and roadmap directions. It is not thirty separate products.

Explore all 12 suites and 30 capabilities10 guided demo · 3 in validation · 17 roadmap

“Available in guided demo” means protected, guided access—not ungated public availability or a production-readiness claim.

Mechanical Integrity

Inspection and risk assessment for fixed equipment.

Risk-Based Inspection (RBI)

AVAILABLE IN GUIDED DEMO

Risk screening and prioritization with visible PoF/CoF inputs, method status, and calculation basis. Current guided workflows do not represent a complete API 581 Part 2/3 engine.

Review basis for Risk-Based Inspection (RBI)

Buyer question

Which equipment should be inspected first, and why?

Review evidence

  • Probability and consequence stay visible beside the risk rank.
  • Inspection effectiveness, damage factor, and consequence assumptions stay reviewable.

Guided review

Open a 5x5 matrix cell and trace a ranked asset back to the assumptions behind it.

Next build

Keep tightening calculation receipts and review language around supported risk drivers.

Condition Monitoring Locations (CMLs)

AVAILABLE IN GUIDED DEMO

Review dated thickness readings, short- and long-term corrosion rates, remaining-life screens, and retirement dates at mapped CMLs.

Review basis for Condition Monitoring Locations (CMLs)

Buyer question

Where is wall loss accelerating, and what date does that create?

Review evidence

  • Short-term and long-term corrosion rates are carried together.
  • Remaining life and retirement dates point back to readings, not copied summary cells.

Guided review

Select a circuit and inspect how one new reading changes retirement date and interval pressure.

Next build

Add stronger exception handling for bad readings, missing nominal thickness, and mixed units.

Asset Inspection Planning

AVAILABLE IN GUIDED DEMO

Internal, external, and thickness-inspection planning with due dates, review holds, and governing basis kept beside the interval when the source is available.

Review basis for Asset Inspection Planning

Buyer question

What is due, what is late, and what code basis supports the date?

Review evidence

  • Intervals stay tied to asset type, service, and governing standard.
  • Due-date changes can be explained from source data and code logic.

Guided review

Review an inspection plan and open the cited basis for a due date.

Next build

Improve owner-facing views for exceptions, deferrals, and management approvals.

Risk & Criticality

Know which assets can hurt you, ranked.

Fleet Risk Matrix

AVAILABLE IN GUIDED DEMO

Plot mapped assets on a 5x5 probability-consequence matrix and open a cell to inspect its assets and displayed method status.

Review basis for Fleet Risk Matrix

Buyer question

Where is the fleet carrying the highest risk today?

Review evidence

  • Matrix cells drill into asset lists instead of stopping at color blocks.
  • Rankings can be reviewed by consequence, probability, service, or unit.

Guided review

Open the high-risk corner and explain why each asset landed there.

Next build

Add side-by-side views for baseline, current, and post-mitigation risk.

Criticality Ranking

AVAILABLE IN GUIDED DEMO

Sort and filter mapped assets by displayed governing risk and supporting reason to focus inspection review.

Review basis for Criticality Ranking

Buyer question

Which assets deserve limited inspection dollars first?

Review evidence

  • Criticality is sorted and filtered by unit, equipment type, and risk driver.
  • Each rank carries the supporting reason, not just a score.

Guided review

Filter the list to one unit and defend the top five items.

Next build

Add exportable review packets for turnaround and budget meetings.

Mobility & Field

The program in the inspector's hand.

Field Calculators

AVAILABLE IN GUIDED DEMO

Browser-run inspection calculations — corrosion rate, remaining life, T-min margin, target interval, and MAWP screening — with unit guards and visible calculation paths.

Review basis for Field Calculators

Buyer question

Can an inspector check the number before it leaves the field?

Review evidence

  • Calculations hold on missing source tags and show NEEDS-INPUT instead of inventing values.
  • Supported outputs keep formula inputs, units, and reviewer-release language visible.

Guided review

Run corrosion-rate, interval, T-min, and MAWP screening checks from field-ready examples.

Next build

Connect calculator results to saved evidence records and reviewer identities.

Turnaround & Outage

Scope, crews, and progress for guided field review.

Turnaround Progress Wallchart

AVAILABLE IN GUIDED DEMO

A guided digital wallchart for inspection progress by unit and equipment type, crew assignments, daily status, and recorded blockers.

Review basis for Turnaround Progress Wallchart

Buyer question

What is done today, what is blocked, and what crew should move next?

Review evidence

  • Progress is tracked by unit, equipment, crew, and report status.
  • Supported status views connect operating summaries to their underlying scope records.

Guided review

Open a unit wallchart, find a blocked item, and inspect the reason.

Next build

Connect more report states and crew handoffs into the same status board.

Data Management

Your existing data in, clean and connected.

Data Import

AVAILABLE IN GUIDED DEMO

Map controlled inspection-data samples from existing spreadsheets into the equipment, CML, and review structures used by the guided workspace.

Review basis for Data Import

Buyer question

Can legacy inspection data become useful without a long implementation?

Review evidence

  • The import flow previews rows, maps headers, and reports validation warnings and errors before import.
  • Problems are reported as review items instead of silently normalized away.

Guided review

Import a workbook and inspect the mapping warnings before accepting it.

Next build

Add more source-specific import profiles and stronger row-level receipts.

Reporting & Analytics

Defensible numbers, on demand.

Dashboards & KPIs

AVAILABLE IN GUIDED DEMO

Fleet coverage, overdue inspections, corrosion outliers, risk trends — the numbers the morning meeting and the auditor both ask for.

Review basis for Dashboards & KPIs

Buyer question

What changed this week, and which number needs action?

Review evidence

  • Supported KPIs drill into affected asset lists and review records.
  • Trends separate data-quality issues from real integrity movement.

Guided review

Open overdue inspections and trace from KPI to asset list to record.

Next build

Add more operator-ready KPI cuts for morning meetings and audits.

Evidence Traceability

AVAILABLE IN GUIDED DEMO

Selected remaining-life and review workflows preserve formula inputs, source references, method status, and unresolved evidence gaps for inspection.

Review basis for Evidence Traceability

Buyer question

Can the answer survive an audit?

Review evidence

  • Supported remaining-life receipts retain required inputs and fail closed when the basis is incomplete.
  • Basis-coverage views identify missing citations, source documents, and calculation fields.

Guided review

Open a supported remaining-life result and inspect its formula, inputs, source references, and missing-data status.

Next build

Extend traceability receipts across more generated report surfaces.

A refinery's integrity program shouldn't live in a spreadsheet one person understands. When that person retires, the knowledge shouldn't leave with them.

STRATEGIC FIT

Built as a focused product. Designed to fit a larger industrial platform.

Vector Integrity combines a working RBI workspace, browser-based engineering screens, import and export tooling, and an evidence-oriented asset data model. Deep Vector Labs welcomes confidential conversations with operators, distribution partners, and strategic organizations that can accelerate adoption or extend the product within a broader inspection, reliability, or EAM portfolio.

Start a confidential strategic conversation